Hurghada
Please Note Air Transport Intelligence (ATI) contains a wealth of information on airports such as full contact details, key management, technical data on runways and terminal, financial data and traffic statistics, full schedule data, the airport's ownership.
However, this information is only accessible to subscribers. If are you a subscriber already, please click to log in, otherwise click here for more information on ATI.
City: Hurghada Country: Egypt IATA code: HRG Personnel: Mr Magdi Morese, Airport Director Schedule Analysis: Orca Air, information is also available on all airlines using this airport and their destinations, movements, aircraft mix and region analysis Traffic Analysis: information available on Freight tonnage, Passenger Numbers and Aircraft movements News: Transavia France to add six new routes this winter (03 September 2007)
Transavia France
is to add six new routes to its network this winter, including destinations in Egypt,
Morocco, Spain
and Tunisia.
Although
Paris Orly-based Transavia
France is yet to formally detail its winter 2007 schedule, ... Related Articles
Dutch carrier Transavia adds three French routes
Transavia to take over Air France's Paris-Marrakech link
Transavia France aims for breakeven by 2009
Air Baltic to add two Egyptian routes (19 September 2006)
Latvian
carrier Air Baltic is to begin Saturday-only service to two Egyptian
destinations from its Riga
base.
On
30 September the carrier will launch flights to Hurghada.
This will be followed on 14 October with the ... Related Articles
GB Airways to start Red Sea services (22 April 2005)
British
Airways franchise partner GB Airways is launching scheduled services to Sharm El Sheik and Hurghada on the Egyptian Red Sea Riviera
from 22 October.
Flights
will operate three times a week to Sharm
El Sheik ... Related Articles
ADP to run five Egyptian regional airports (20 December 2004)
French
airports operator Aeroports de Paris (ADP) has secured the second of two
concessions to manage Egyptian airports, having been awarded a deal to run five
regional facilities in the country.
ADP’s
contract will run for six ... Related Articles
History: In 1996 a new apron was completed.
A 4,000m2 extension was added to the terminal building in 2007, enabling the airport to handle up to 7.5 million passengers per year. Technical Category: typical technical data includes; runway length, runway orientation, number of terminals and much more